0h 0m 0s
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place using the SUM defaults?
After SUM has ended
During the Pre-processing roadmap step
Before the start of the SUM technical downtime
During the Post processing roadmap step
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question
You need to build up an Sl check framework by applying SAP Notes
The SI checks are executed in the development system and the results are transported into the subsequent systems.
You need an SAP system based on AS ABAP 7.52 or above for the SI check framework.
The errors from the SI checks must be solved; otherwise, SUM will report an error.
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.
Perform an SAP S/4HANA conversion including DMO
Perform an SAP S/4HANA conversion without DMO
Upgrade the SAP system.
Apply SAP Support Packages.
Use DMO for SUM.
You want to perform an SAP S/4HANA conversion using SUM with inplace DMO.Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note. There are 3 correct answers to this question.
Generation of the new ABAP loads in phase RUN_SGEN_GENER8
Import of dictionary objects from the download directory in phase DDIC_UPG
Creation of application tables in the SAP HANA database in phase EU CLONE MIG_DT_CREATE
Activation of dictionary objects in phase ACT_UPG
Import of upgrade and language data from the download directory in phase TABIM UPG
You want to use the Custom Code Migration Worklist via remote code analysis using the ABAP Test Cockpit (ATC).How can you get the latest content of the simplification database?
Configure it within transaction ATC
Apply the corresponding SAP Note via the Note Assistant.
Generate it by analyzing the specific custom code via RFC
Download it from the SAP Support Portal.
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note. There are 2 correct answers to this question.
TABIM UPG
TABIM_SHADOW_INC
PARMVNT_UPG
PARDIST SHD
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks must be performed during the preparation phase?
Run the database migration to the SAP HANA database
Solve problems from the simplification item (SI) checks.
Perform the migration of data to the new data structure
Check the compatibility of custom code with SAP S/4HANA.
During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?
Table count verification
Migration repetition option
Table contents compare
DMO with system move
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?
Credentials of user DDIC in client 000 of the shadow system
Credentials of user DDIC in the development client of the development system
Credentials of a named user in client 000 of the shadow system
Credentials of a named user in the development client of the development system
What is the minimum SAP BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server 2022?
700
740
750
731